The suspended structure was designed to be truss stiffened, and its erection was carried out without disturbing heavy sea traffic reaching about 1400 ships per day.
大桥加劲梁为桁架式,架设时没有干扰桥下日通行量达1400艘的船舶交通。
2
During construction, key problems including automatic cutting of through line, construction quality management, as well as erection of large-span truss were solved.