Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.
并对主梁立模标高和斜拉索的张拉索力的主动修正问题进行了分析和讨论。
2
The erection elevations of formwork for segment concrete were given by comprehensive analysis to ensure that the geometry and the internal force state meet the design requirements.