This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
2
Last but not least, the HS 855 HD has an innovative self-loading and fast erecting system, so that a second crane is not needed for the unloading or erecting work.