When it came to filling up the tank, the water had to be applied with a syringe to ensure the arrangement was not disturbed.
为了确保这些布置不被打乱,还得用注射器往水槽里灌水。
2
Therefore the proper plan of the filling of dam body and the arrangement of access roads to dam crest are the key problems to ensure the strength of construction.