Profile survey is transportation, water conservancy, electricpowerengineering construction must be done.
断面测量是交通、水利、电力等工程建设中必须进行的工作。
2
With the rapid development of the electricpower cause of our country, the electricpowerengineering cost management which is closely related to electric cause is more and more important.
随同灭人邦电力事业的飞快收铺,取电力事业亲密相闭的电力建设工程管理工做也越来越现示出从要做用。
3
In the 1990s, Anhui No. 2 ElectricPowerEngineering & Construction Corporation was one of the first companies that employed a multiple-site construction method in accordance with the market needs.