Some of the sites were up to 50 miles from the base so normally I would eat the foil packs they sent out to the site and slept in my parka on the steel-plated decks of the silo.
The meanings and theoretical base of advanced planning & scheduling(APS) and the necessity of developing advanced planning & scheduling system in aluminum foil enterprise are discussed in the article.
探讨了先进计划与排产的含义和理论基础,探讨了在铝箔企业开发先进计划与排产系统的必要性。
3
Deseribes the new FPC application FPC material technology including Cu foil, base film, adhesive, cover lay etc, and FPC manufacturing technology.