When the simulation runs, the work is created faster than the allocated resources can process it, so there will be a resource shortage.
在运行模拟时,创建工作的速度比所分配的资源能够处理的速度还要快,因此会出现资源短缺。
2
The management prioritizes documented action plan items. The action plan includes the action, responsibility, timing and allocatedresource.
管理者应该细化措施计划文件中的每项条款,措施计划包括:措施,职责,时间和资源分配。
3
WS8 also provides resource metering, informing both on static measures -virtual CPUs or disk space allocated -, and on dynamic ones, such as CPU consumption or network bandwidth used.