B. Fasttracking often results in rework, and crashing often results in increased cost.
快速跟进经常导致返工,赶工经常导致成本增加。
2
The objective of fasttracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.
项目快速跟进的目标是:提高生产效率减少项目历时提高进度跟踪控制降低项目风险。