The paper describes briefly the study of exploitability of PP/FRP tank, and the result is satisfied.
本文简述了PP/FRP贮罐的开发性研究,并取得了满意的结果。
2
Then, the structural and non-structural measurements of flood utilization are discussed, and points out the method of improving exploitability of flood resources in the following.
接着探讨了洪水资源化利用的工程和非工程途径,指出了洪水资源开发性提高的措施。
3
Cannot determine exploitability and mitigating factors: Often, a static analyzer cannot automatically assess the exploitability of certain issues, or the presence of mitigating factors.