The hookup of storage tanker is the key step in the offshore installation of floatingproductionsystem.
浮式生产储油船的海上安装连接是单点系泊系统海上安装的关键性工程。
2
Used fault diagnosis method based on Principal Components Analysis to research the fault monitoring and diagnosis of FloatingProduction Storage and Off-loading system.
应用基于主元分析的故障诊断方法对浮式油轮生产储油卸油系统进行故障检测与诊断研究。
3
The steel casting lifting point of single point mooring (SPM) is an important pivot of the SPM to connect floatingproduction storage system.