Framing a feasible test plan to evaluate the working life reliability of such components within limited test period is urgently required in engineering practice.
工程中迫切需要制定合理可行的验证试验方案,在有限的试验周期内验证产品的可靠性是否符合指标要求。
2
The house is named House 50 50 —in reference to its half-indoor, half-outdoor design—and is L-shaped in plan, framing a driveway at the property's entrance.